Case Study

Client: WHP

Scope

Procurement, fabrication and installation of the following:

Description

  • Fabrication and installation of 1No- main Cabinet Grillage
  • Fabrication and installation of 1No- Upper RRU/BOB beam x 4-metres
  • Fabrication and installation of 1No- Upper RRU/BOB beam x 6.950-metres
  • Fabrication and installation of 16No- 76.1 x 3.2 mm cable poles x 1500 mm long as per drawing 506 c/w RSA supports.
  • Fabrication and installation of 1No- access ladder
  • Fabrication and installation of 1No- step-over
  • Flooring panels to be 25 x 5, 41/100 pattern, handrails standards -42.4 x 3.2 mm tube complete with 42 mm x 3.2 mm tube
  • Rails and 150 x 6 flat kick plates.
  • Works based on CE Class 2

Gallery

Click to view

Get in touch

Structural Fabrications Ltd was formed in 1993 to supply fabrication, engineering and all structural steelwork. Today the service offer includes design, consultation, manufacture, installation and maintenance of projects from one central office.

Ⓒ 2021 - All Rights Are Reserved